Thread Content
According to a report from Xinjiang Yihua in March 2026, the power station facility designed to support the production of 80,000 tons of melamine per year at Xinjiang Yihua was successfully commissioned recently. The system is currently running smoothly. The Xinjiang Yihua project, with an annual production capacity of 80,000 tons of melamine, involves the construction of a 1×770 tons/hour high-temperature and ultra-high-pressure coal powder boiler along with its supporting equipment. The second-phase project of Xinjiang Yihua for 80,000 tons of melamine involves the construction of one set of production facilities capable of producing 80,000 tons per year of melamine as well as systems for recovering waste gases; one backup gasification furnace with a capacity of 60,000 standard cubic meters per hour; and one boiler with a capacity of 770 tons per hour. Additionally, auxiliary facilities such as a circulating water station, a desalinated water station, a reclaimed water station, office buildings, plant substations, and cabinet rooms will be built as part of this project.
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Eyewash Station Water Outlet Height Less Than 15 cm https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715076 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【3D Process Flow】Summary Post--Anti-emulsion Extraction Process Flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715058 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first fully electrically driven pyrolysis gas compressor in China was successfully tested at the Tarim Phase II ethylene project of Dushanzi Petrochemical Company. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714974 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3033–2026: China’s first 10,000-tonne-scale demonstration production line for the fiberization of coal-based solid waste goes into trial operation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715051 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2037 to 2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, Tianhua Institute successfully designed and manufactured G5 electronic-grade isopropanol production equipment, which was then applied in CNPC’s first high-end electronic-grade IPA production system. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715928 (Source: Haichuan Chemical Forum (HCBBS))