Layout of above-ground pipelines?

2023-08-17View Original

Thread Content

In chemical plants, in addition to underground pipeline installations, there are also many pipelines above the ground. Some of these are installed on tall pipe racks, some use low-mounted systems, some are laid close to the ground, and some even rely on buildings or structures for support. What factors are taken into account when deciding on the type of installation to use?
Reply #22023-08-17
There are corresponding standards to support them
Reply #32023-08-20
Consulting experts in the general layout field, the arrangement of above-ground pipelines should be determined through comprehensive consideration of factors such as production safety, the properties of the materials used, production processes, ease of maintenance, transportation, and the overall appearance of the plant.
Reply #42023-08-20
Pipelines involving fire hazards, corrosive, or toxic media (other than those in the building where they are used) shall not be supported by the building structure.
Reply #52023-08-27
The choice of layout is primarily determined by the fact that most pipes in chemical plants are installed in pipe trays, while water-related pipes are generally laid directly underground. Pipelines involving fire hazards, corrosive substances, and toxic media must not be laid underground. For details, refer to the relevant standards and specifications: GB 50187, Design of Pressure Piping and Engineering Stress, Design of Petrochemical Piping, SH 3011, and other such standards.
Reply #62023-08-27
The pipeline layout is primarily determined by the site layout; the various units are connected through pipe galleries or pipe piles, and access to the units or buildings relies on structural elements. Pipelines should be arranged on the top or bottom floor, on either side of the pipe rack or in the middle, depending on factors such as the medium and pipe diameter.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.