Tianguan Lingang New Energy Co., Ltd.: Tender for the design and equipment procurement of a 15,000 Nm³/h methanol-to-hydrogen plant for its 300,000 tons/year biomass liquid fuel project

2025-07-23View Original

Thread Content

On July 21, an invitation for bids was issued for the design and equipment procurement of a methanol-to-hydrogen plant with a capacity of 15,000 Nm³/h, as part of Guangxi Free Trade Zone Chuan Gui Lin Gang New Energy Co., Ltd.’s 300,000 tons per year biomass liquid fuel project. According to the tender announcement, the construction site for the 300,000 tons per year biomass liquid fuel production project of Guangxi Free Trade Zone Chuan Gui Lin Gang New Energy Co., Ltd. is located to the west of Nangang Avenue in Qinzhou Port, and to the south of the Qinzhou Port railway traction station. With an investment of around 840 million yuan and covering an area of about 130 mu, it uses waste animal and plant oils as raw materials, including gutter oil, swill oil, acidified oil, fatty acids, etc. It employs a two-stage hydrogenation process to produce biodiesel (HVO) and sustainable aviation fuel (SAF). Scope of the tender: 1. Design (excluding civil engineering foundations): Design, on-site supervision for installation, technical services, personnel training, assistance with commissioning, and performance testing for a methanol cracking hydrogen production unit with a production capacity of 15,000 Nm³/h. 2. Equipment procurement: This includes 1 set of methanol cracking hydrogen production unit with a capacity of 15,000 Nm³/h, along with various supporting non-standard/standard process equipment, instruments (including programmable valves), catalysts and adsorbents, as well as spare parts required for operation (including replacement parts). Planned delivery time: 1. Design period: Detailed design results shall be submitted within 12 weeks from the date the contract comes into effect. 2. Duration of design services: From the date the contract comes into effect until the project is completed and accepted. 3. Equipment delivery deadline: 8 months from the date the contract comes into effect. Agents and consortia are not permitted to submit bids for this project.
Reply #22025-07-23
【Ten Years of Rapid Development in Chemical Equipment】The largest coal-based ethylene plant in China, with a single-unit capacity of 2554–2025, has been put into operation in Xinjiang! https://bbs.hcbbs.com/thread-5697315-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-23
【Ten Years of Rapid Development in Chemical Processing Equipment】Significant progress has been made on China’s first large-scale cryogenic reliquefication unit for LNG carriers, 2554–2025 https://bbs.hcbbs.com/thread-5697344-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-07-24
【Haichuan Teahouse】High-tech and cutting-edge admission notice from Beijing University of Chemical Technology https://bbs.hcbbs.com/thread-5697350-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #52025-07-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】2556–2025: Internationally Advanced Distillation and Pyrolysis Technologies for Circuit Boards Containing Components https://bbs.hcbbs.com/thread-5697360-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-07-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, Shangyu, Zhejiang will have built China’s first highly automated flexible/mass-production lines for semiconductor KrF lithography resin on a scale of 100 tons each. https://bbs.hcbbs.com/thread-5697374-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-07-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】2662-202: Tianhua Institute Helps Achieve Major Breakthroughs in the Localization of Waste Heat Recovery Equipment for Coal-to-Gas Production https://bbs.hcbbs.com/thread-5697411-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-07-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】2563–2025: China’s first \"steam extraction energy storage\" molten salt thermal storage peak-shaving project passes acceptance test https://bbs.hcbbs.com/thread-5697419-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-07-25
【History of Haichuan Chemical Industry】Welding expert Pan Jiluan and the establishment of welding programs in Chinese universities https://bbs.hcbbs.com/thread-5697433-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-07-28
【Ten Years of Rapid Development in Chemical Equipment】World’s largest alkane integration production facility built and put into operation in Fujian from 2025 to 2568 https://bbs.hcbbs.com/thread-5697547-1-1.html (Source: Haichuan Chemical Forum)
Reply #112025-07-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】2569–2025: The first high-altitude fire-fighting drones produced in Zigong https://bbs.hcbbs.com/thread-5697556-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.