Thread Content
No check valve is installed on the nitrogen sealing pipeline of the storage tank. Standard reference: GB 50160-2018 Code for Fire Protection Design of Petrochemical Enterprises. Article 7.2.7 states the following requirements regarding the connection of utility pipelines with pipelines or equipment that handle flammable gases, liquefied hydrocarbons, and flammable liquids: 1. Check valves shall be installed on utility pipelines that are in continuous use, along with isolation valves at their ends; 2. On utility pipelines that are used intermittently, check valves together with one isolation valve or two isolation valves shall be installed, with a inspection valve placed between the two isolation valves; 3. Utility pipelines that are used only when the equipment is not in operation shall be equipped with blind flanges or disconnected.
【HaiChuan Safety Discussion Forum】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemicals Forum)
【Common Issues in Haichuan Pipeline Design】Lack of insulation in outdoor eye wash station pipelines https://bbs.hcbbs.com/thread-5705732-1-1.html (Source: Haichuan Chemical Industry Forum)
【Common Issues in Haichuan Pipeline Design】Don’t Let Valve Stem Handles Become an Obstacle https://bbs.hcbbs.com/thread-5705775-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Common Issues in Haichuan Pipeline Design】No local pressure gauge is installed at the pump outlet, or it is not convenient for operation. https://bbs.hcbbs.com/thread-5705825-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline welding robot for the period 2834–2025 has been put into use. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2834-2025 intelligent pipe full-position welding robot has been put into use officially. https://bbs.hcbbs.com/thread-5705686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2028 to 2025, Lanshi Group developed China’s first 90MPa ionic liquid hydrogen compressor, which underwent 90MPa hydrogen cycle pressurization tests. https://bbs.hcbbs.com/thread-5705737-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))