HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Wuhuan Project has been pre-selected for the design work related to the hydrogen and ammonia production phase of the first stage of the wind and solar-powered hydrogen production for ammonia synthesis integrated project in Wushen Banner, as well as the design of the auxiliary infrastructure for hydrogen and ammonia production

2026-06-17View Original

Thread Content

The 25th National \"Safety Production Month\" in 2026: Everyone talks about safety, and everyone knows how to handle emergencies; identifying and addressing risks and hazards. -------------------------------------------------- Recently, the design project for the hydrogen and ammonia production facilities as well as the auxiliary systems related to hydrogen and ammonia in the first phase of China Coal Green Energy (Ordos) Energy Technology Co., Ltd.’s integrated wind and solar hydrogen-to-ammonia project in Wushen Banner was awarded to a winning bidder. The company selected is China Fifth Ring Engineering Co., Ltd., which will be responsible for the overall design of the ammonia synthesis process as well as all the auxiliary systems in the plant. The integrated technology demonstration project for producing green ammonia via wind and solar power to generate hydrogen, developed by China Coal Green Energy (Ordos) Energy Technology Co., Ltd., is located in the Tuke Industrial Park of the Sulihe Economic Development Zone in Wushen Banner, Ordos, Inner Mongolia. As a flagship green hydrogen chemical demonstration project of the China Coal Group, it involves an total investment of 17.2 billion yuan and will be constructed in phases; the ultimate production capacity is set at 500,000 tons per year of green ammonia, along with associated green urea. Among them, the core capacity of Phase 1 hydrogen-ammonia project + auxiliary infrastructure projects is as follows: 1. The main ammonia synthesis unit – a flexible ammonia synthesis plant with a capacity of 634.3 tons per day, enabling an annual production of 149,500 tons of green ammonia (approximately 150,000 tons); the operating range of this unit is 20% to 110%. Supporting facilities include a nitrogen production plant with a capacity of 19,000 Nm³/h and a carbon dioxide purification plant with a capacity of 12,953 Nm³/h. 2. Hydrogen production, storage, and transportation infrastructure (designed simultaneously): Hydrogen production via water electrolysis: 64,000 Nm³/h alkaline electrolyzer system. Hydrogen storage: 13 x 2,000 m³ spherical hydrogen storage tanks + 22,000 Nm³ of solid-state hydrogen storage; total hydrogen storage capacity is 308,000 Nm³. Supporting systems include hydrogen transport compressors, chilled water systems, a plant management platform, circulating water systems, fire protection systems, as well as power distribution and other auxiliary systems. 3. Scope of utility projects: basic design for all utility systems throughout the plant, including the overall plant layout, circulating water systems, air separation units, refrigeration systems, steam systems, sewage treatment systems, hazardous waste storage areas, power distribution and transformation systems, automation systems, HVAC systems, fire protection systems, as well as hydrogen/ammonia transmission pipelines.
Reply #22026-06-17
【HaiChuan Chemical Valve Management】Self-acting nitrogen seal valve: Maintaining the \"safe airtight barrier\" for chemical storage materials https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723788 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-06-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 10,000-ton biomass pressurized gasification pilot plant developed by China Energy Engineering Group over the period 2031–2026 has successfully completed a 72-hour continuous operation test! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5723938 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-06-21
[Haichuan’s Guide to Chemical Equipment] -- Liquid ring vacuum pump https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724058 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #52026-06-21
【Haichuan Teahouse】The classic Chaoshan fish dish, Balang Fish: 4 cooking methods unknown to outsiders! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724063 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-06-21
【Safety Management and Standardization of Special Equipment】Illustrated Quick Reference for Major Hazard Risks in Special Equipment! On-site inspection allows for direct comparison, enabling immediate identification of high-risk factors. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724082 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #72026-06-22
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #82026-06-22
【History of Haichuan Chemical】The past and present of China’s first water treatment plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724185 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92026-06-23
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Forklifts Without License Plates; It does not comply with the provisions of Article 4.12.2 of the \"Rules for the Management of the Use of Special Equipment\" TSG 08—2026: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5724341 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.