HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Weekly Topic】【Civil Engineering Version 20170116】

2017-01-16View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 9 wealth. Risk control measures should be reviewed before implementation, and the main aspects of this review include (  ).   A. Have the implemented changes reduced the risk to an acceptable level? B. Have new sources of hazard been created? C. Has the most cost-effective solution been selected? D. Can the preventive measures introduced be fully implemented? E. Have the changes eliminated the risk? Reference: A B C D
Reply #22017-01-16
A. Have the implemented changes reduced the risk to an acceptable level? B. Have new sources of hazard been created? C. Has the most cost-effective solution been selected? D. Can the preventive measures introduced be fully implemented?
Reply #32017-01-16
The ABCE risk control measures plan should be reviewed prior to implementation, and the main contents of the review include (ABCE).
Reply #42017-01-16
This post was last edited by wangld on 2017-1-16 14:00 with ABCD

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.