This post was last edited by At the foot of the hillside on 2017-7-27 09:53. Discussion on common piping errors 011: Which of the following designs (the diagram shows the piping design for the pump inlet) is correct? A. B. Answer: B. To prevent cavitation, the pump inlet valve must be larger than or equal to the diameter of the pump inlet pipe; it cannot be smaller. PS: Excerpted from the Chemical Pipeline Design Manual
Reply #22017-07-27
To prevent pump cavitation, the diameter of the pump’s inlet pipe must be greater than or equal to the pump’s inlet diameter. Therefore, B is correct.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.