I have a project that involves hydrogen hazards; the company’s management says that decisions regarding layout, etc., are made through collective decision-making, but the signing is done by the designer,...

2017-08-07View Original

Thread Content

I have a project that involves hydrogen hazards. The company’s management said that decisions regarding layout and fire safety distances are made through collective decision-making, but it is the designer who signs off on the design. In the event of problems, is responsibility shared among the team or falls on the designer alone? ? ?
Reply #22017-08-07
Should the things that need to be designed be decided collectively? . . . . This character seal is not acceptable
Reply #32017-08-07
No, we are all involved in sewage treatment; we are not experts in handling hazardous materials. Therefore, decisions are made collectively, but the signature must come from the person who designed it. It’s not that everything that needs to be designed must first be decided upon collectively before the designer signs off
Reply #42017-08-07
Personally, I believe that professional documents such as drawings should be signed by the designer and reviewed by the technical supervisor. Decisions regarding a project must be signed by the top leader before it can be implemented.
Reply #52017-08-07
Whoever signs is responsible. If it’s not done professionally, it should be outsourced to a professional subcontractor; the design should be carried out by a design institute. Even if you sign, construction will still be illegal if there is no official stamp indicating qualified competence. Decisions should be made collectively – do you have any evidence of such collective decision-making?
Reply #62017-08-07
Are there any requirements for qualifications such as a certified control engineer to implement planar PID control? We are Class B in environmental design
Reply #72017-08-07
Even if there are meeting minutes, it still counts as negligence on your part
Reply #82017-08-07
Does PID require qualifications for pressure pipelines and permits for urban and rural planning?
Reply #92017-08-07
Are there any specific qualifications required for preparing explosion-proof and fire-resistant layout plans or floor plans?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.