HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Fundamentals of Manufacturing Processes (True/False Questions) 20170830

2017-08-30View Original

Thread Content

In enclosed pump rooms of classes A, B, and C, or gas compressor rooms of class A, with an indoor volume of less than 500 m3, it is advisable to install fixed screen tubes at a height of 150–200 mm above the ground along one side wall; semi-fixed connectors should be installed along the other side wall. In other pump rooms of classes A, B, and C, or combustible gas compressor rooms, semi-fixed connectors are recommended.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.