HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is there a problem with the piping installation of this pump?

2018-01-08View Original

Thread Content

This post was last edited by Zhang Long201314 on 2018-1-8 00:39. Is there a problem with the piping installation of this pump?
Reply #22018-01-08
It is mainly a problem with air expulsion in the inlet pipeline before the pump starts. If the pump has good self-priming capabilities and allows a small amount of gas to remain in the medium, there should be no major issues.
Reply #32018-01-08
I don’t understand this question. Should I ask for clarification or purchase the material?
Reply #42018-01-08
Are you planning to send the treated wastewater back to the sludge layer for further treatment? Is it not possible to connect the pipe to the pool or convergence point at the front end of the water inlet?
Reply #52018-01-08
Do I still need to purchase pictures for the discussion questions? ?
Reply #62018-01-19
You still have to download it just to view the image; money isn’t the issue – the real problem is the lack of money

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.