HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Pipeline Valve Technology Edition-Daily Question Common Mistakes in Piping] 20170730

2017-07-30View Original

Thread Content

Discussion of Common Piping Errors 014: Which of the following designs (the picture shows the piping design of the sampling point) is correct? AB Answer: B. When the safety valve is closed for discharge, the safety valve should be as high as possible higher than the discharge main pipe. P.S.: Excerpted from "Chemical Piping Design Manual"

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.