HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the relationship between closed-floor systems and leak-proof floors?

2019-03-08View Original

Thread Content

What does the last sentence of clause 5.2.20 in GB50160-2018, which states that \"closed floor slabs shall be leak-free floor slabs,\" mean? Is a closed-floor system a leak-free floor system? Is one type of closed-floor system a leak-free floor?
Reply #22019-03-08
Basically, there shouldn’t be any big or small holes in the floor.
Reply #32022-10-22
Dude, is there an answer to the post you made three years ago?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.