HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

High and low pressure venting at CNG filling stations

2019-11-21View Original

Thread Content

May I ask whether the high-pressure and low-pressure vent pipelines at the CNG supply station should connect to two separate vent pipes or just one? If a discharge pipe is used, how is the height difference between the two air inlets calculated?
Reply #22019-11-22
Please take a look at Hai Chuan’s post: Do the vent pipes at CNG refueling stations need to be installed separately? https://bbs.hcbbs.com/thread-669268-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.