This post was last edited by henglinkou on 2020-11-17 at 19:37. Post No. 22 in the series “Lao K talks about various aspects of the petrochemical design industry”: Names and codes for project design phases. As for the names and codes of project design phases, those working in design firms generally are aware of them, but some people are not so familiar with them. Among those who are not from design firms, most also do not know much about them. Regarding the codes used in the project design phase, most design institutes currently use English abbreviations, although there are also some variations. The names and codes for the project design phases are shown in the table below: Table 22-1 Project Design Phase Names and Codes. Sequence Number, Project Phase Name, Code, English Name of Project Phase: 1. Pre-project phase, 1, PPR, Project Proposal; 2. Conceptual and planning design, PRP, Proposal; 3. Pre-feasibility study report, PFS, Pre-feasibility Study Report; 4. Feasibility study report, FSR, Feasibility Study Report; 5. Project application report, PER, Project Establish Report; 6. Social stability risk analysis, SRS, Social Stability Risk Analysis; 7. Energy conservation assessment, ECA, Energy Conservation Assessment; 8. Bid price, BID, Bid. 2. Process design package, PDP, Process Design Package. 3. Conceptual design (equivalent to overall planning design), CDP, Conceptual Design Package. 4. Engineering design phase: 1. Basic engineering design, BED, Basic Engineering Design; 2. Detailed engineering design, DED, Detail Engineering Design. Lao K talks about various aspects of the petrochemical design industry every week. For previous posts, please see the links below: Post 1: The development history of China’s survey and design industry: https://bbs.hcbbs.com/thread-3031149-1-1.html Post 2: Management in the survey and design industry: https://bbs.hcbbs.com/thread-3036417-1-1.html Post 3: The development of drawing techniques in design institutes: https://bbs.hcbbs.com/thread-3039960-1-1.html Post 4: The evolution of professional divisions in petrochemical design institutes: https://bbs.hcbbs.com/thread-3045261-1-1.html Post 5: The organizational structure of petrochemical engineering companies: https://bbs.hcbbs.com/thread-3050591-1-1.html Post 6: Contract management in design management: https://bbs.hcbbs.com/thread-3054762-1-1.html Post 7: Management of design basic data in design management: https://bbs.hcbbs.com/thread-3058184-1-1.html Post 8: Quality management in design management: https://bbs.hcbbs.com/thread-3061718-1-1.html Post 9: Schedule management in design management: https://bbs.hcbbs.com/thread-3062161-1-1.html Post 10: Document management in design management: https://bbs.hcbbs.com/thread-3069580-1-1.html Post 11: Meeting management in design management: https://bbs.hcbbs.com/thread-3073327-1-1.html Post 12: Bonus distribution management in design management: https://bbs.hcbbs.com/thread-3077492-1-1.html Post 13: The construction process for petrochemical projects: https://bbs.hcbbs.com/thread-3082708-1-1.html Post 14: Illustrations of the content and procedures of process professional design: https://bbs.hcbbs.com/thread-3086849-1-1.html Post 15: Explanations regarding PID versions and PID modification management: https://bbs.hcbbs.com/thread-3091076-1-1.html Post 16: Common energy-inefficient designs in the petrochemical industry: https://bbs.hcbbs.com/thread-3095859-1-1.html Post 17: Project work breakdown: https://bbs.hcbbs.com/thread-3100837-1-1.html Post 18: Issues related to design talent training: https://bbs.hcbbs.com/thread-3105529-1-1.html Post 19: A brief explanation of pump net positive suction head: https://bbs.hcbbs.com/thread-3109916-1-1.html Post 20: On excessive patent applications: https://bbs.hcbbs.com/thread-3111855-1-1.html Post 21: Pressure drop and energy consumption of control valves: https://bbs.hcbbs.com/thread-3116754-1-1.html
Reply #22020-11-15
After 40 years of reform and opening up, CDI has largely aligned itself with international standards, and Chinese engineering companies have established a strong presence around the world, including in the Middle East and North America.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.