Workshop high-level tank

2020-12-10View Original

Thread Content

According to the current requirements, the workshop is not allowed to have high-level storage tanks connected to the tank area. However, considering the long distance from the tank area, the large number of usage points, and factors related to measurement, it is desired to set up temporary storage tanks in the workshop. Is it possible to do this for materials such as liquid caustic? How can one persuade experts? And the design institute. Thanks to all the experts from various fields for their advice!
Reply #22020-12-10
It is better to consult the inspectors directly to get recommendations for manufacturers, and to observe and learn from them.
Reply #32020-12-10
First, it is necessary to understand the reasons why setting up a high-level tank is not allowed; then explain the purpose and necessity of wanting to establish a temporary storage tank, as well as the measures to address those reasons against setting up a high-level tank. Otherwise, it will be impossible to convince the experts and design firms
Reply #42020-12-11
The reason is that the current detailed specification 5.5.1 sets requirements for the installation of storage tanks within the factory building: they must be arranged in a centralized manner, and there are specified distances between them. It’s equivalent to no. To determine whether this tank is a workshop tank, it depends on whether the material pipelines come from the tank area; therefore, it’s a dead end with no way forward. For substances similar to liquid caustic, there are 20 usage points in a single workshop, and the quantities vary; it is difficult to achieve proper control over the production process by feeding materials directly from storage tanks, and even if such control is possible, it would be very complex to set it up.
Reply #52020-12-11
We are currently in the project design phase, so settings are not allowed.
Reply #62020-12-11
This is not a difficult task; control is not required at the tank area – it can be handled at each user site. By increasing the diameter of the pipes and enhancing their buffering capacity, it is possible to avoid any impact on the main pipeline network when new users are added or existing ones are removed
Reply #72020-12-11
This can actually be avoided; most companies have regional intermediate tanks to enable two-level interlocking. Moreover, if liquid is pumped directly from the tank area to the workshop, it depends on how the design team defines the relationship between the storage tanks and the metering equipment. Just like our liquid caustic and sulfuric acid, there are intermediate tanks in each workshop from where they are then distributed to various stations within those workshops.
Reply #82020-12-11
Thank you, I can give the measuring equipment a try.
Reply #92020-12-11
There are over 300 meters from the raw material storage area to our workshop usage point, which makes it a bit difficult to control production.
Reply #102020-12-11
Why can’t it be set? It’s complete nonsense. You can’t place raw material storage tanks similar to those used in tank farms inside the workshop, but you can install equipment there to prepare the materials yourself. It’s okay to add materials coming from the tank farm to the reaction equipment after they have been measured in measuring tanks! If it’s really not possible to add one, consider other measurement methods, such as using a flow meter and shut-off valve in the pipeline
Reply #112020-12-11
It’s difficult to exert control at the source, so control is achieved by managing the users – being close to them allows for rapid responses

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.