HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Do four-wire instrument power lines and signal lines require two glands each?

2017-09-13View Original

Thread Content

Do the 24V DC power supply and the 4-20mA signal cable need to be separated from the Grant? Is a four-core cable sufficient with just one gland?
Reply #22017-09-13
Field instruments powered by DC24V are generally two-wire systems. The power supply for four-wire instruments is generally 220VAC, and the power lines and signal lines should be separated.
Reply #32017-09-13
The four-wire type has 24V DC
Reply #42017-09-13
In a four-wire system, they are generally separated; the electrical interfaces for power and signals are distinct from each other.
Reply #52017-09-13
They are all 24V, so there’s no need to separate them; the power consumption of the smart transmitters on site is very low
Reply #62017-09-13
Look, with a 220V supply separated, 24V can be used directly with 4 wires
Reply #72017-09-13
Although it’s a 24V power supply, I still think it’s better to have the power supply and the signal separated. Because it will be more convenient for future modifications, cable inspections, and maintenance. Moreover, it is also difficult to run four-wire cables through tubes. Besides, in case the instrument is later switched to 220V power supply, there’s no need to change the wiring.
Reply #82017-09-14
There is no need to separate the 24VDC power supply; the 220V one needs to be separated
Reply #92017-09-14
Since 24VDC is a low voltage, a four-core cable can be used. But it is better to use 2 RVVP2*1.5 cables with 2 glands.
Reply #102017-09-14
24V has no interference, so it’s fine
Reply #112017-09-14
It is not an intelligent transmitter; the power supply circuit allows a current of up to 100mA

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.