Regarding the commissioning of the new installation

2018-02-23View Original

Thread Content

Regarding the kick-off meeting for a newly constructed facility, is it usually organized by the design institute or the owner? What are the typical topics covered in such meetings?
Reply #22018-02-24
They can all be convened, and the main items are as follows: 1. Reconfirm the design conditions and design basis. It is usually proposed by the design institute. 2. Clarify the matters not specified in the technical annex. It is usually proposed by the design institute. 3. Confirm the rules for design numbering, such as the rules for section numbers, unit numbers, area numbers, as well as equipment numbers, pump numbers, instrument tag numbers, and complete unit numbers. It is usually proposed by the design institute and confirmed by the owner. 4. Relevant professionals from various fields shall meet to establish agreements regarding the design standards, principles, and requirements that are not mentioned in the technical attachments. 5. Specify the document transmission channel, format, and numbering rules ; As well as the requirements for review, check, and approval. 7. Review and determine the progress of engineering/design/purchase ; The timing for exchanging files. Note: At the start of a meeting, only matters that will result in business changes can be discussed, depending on the authority granted to each company.
Reply #32018-02-24
After reaching an agreement, go to the design institute or equipment manufacturer to have a meeting; the main purpose is to get to know each other and discuss any contentious issues
Reply #42018-02-24
The auxiliary facilities are presumably owned by the owner, while the new ones are designed by a design institute. Starting work simply means discussing the plan for getting things underway and the relevant safety measures, determining who will give orders, and assigning responsibilities and tasks.
Reply #52018-02-24
The project kick-off meeting is organized by the design institute, and is chaired by the project manager of the institute. The meeting agenda includes: 1. Clarifying the work scope and basic requirements of the design institute ; 2. Determine the list of authorized representatives and key professionals from both the owner and the design institute, as well as the communication channels and coordination procedures (to be drafted by the design institute) ; 3. Discuss tasks related to the project plan ; 4. Identify the main control nodes. The meeting minutes are drafted by the design institute and issued after being signed by representatives from both parties.
Reply #62018-02-24
The commencement of a construction project is organized by the design institute; The commissioning of a construction project after the materials are supplied will be organized by the owner. It is not distinguished by “brand new”/“accessory”.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.