HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help with Siemens 200 programs

2018-03-06View Original

Thread Content

I’m a bit confused about a Siemens 200 program. I hope the experts here can help me. Requirements are as follows: 8 flow paths for sampling into one instrument, 8 solenoid valves, to analyze H2 content. After the start button is pressed, solenoid valve 1 opens for 4 minutes before closing, thereby opening the 8 solenoid valves in a repeating cycle. Due to the consideration of replacement time, the H2 content remains at the level of the flow path with the previous solenoid valve open for the first 2 minutes before analysis. I just drew a diagram randomly. . . . Is it easier to write programs using pointers, everyone? Please give some ideas. :handshake
Reply #22018-03-28
Can’t this just be done with a simple timer? I didn’t understand this: “Maintain the flow rate in the path with the previous solenoid valve open for the first 2 minutes during H2 content analysis.”

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.