When testing high-pressure pipelines, can instruments and valves be tested together?

2018-05-09View Original

Thread Content

During the pressure testing of high-pressure pipelines in high-pressure gas filling installations, can the instruments, valves, flow meters, etc. installed on the pipelines be tested together as well? The pressure used for testing is 1.5 times the design pressure of the pipeline; please explain the reason.
Reply #22018-05-09
For such situations, please refer to SH 3501-2011 Code for Construction and Acceptance of Steel Piping Projects for Toxic and Flammable Media in the Petrochemical Industry
Reply #32018-05-09
The purging system needs to be removed, but the pressure testing must be carried out together with the process piping, with all valves fully open.
Reply #42018-05-09
GB 50093-2013
Reply #52018-05-12
For the initial pressure test, it is not recommended to fully open the instrument valves.
Reply #62018-05-22
That’s a great question. I think it’s fine to conduct pressure testing together, as long as it’s ensured that impurities don’t get into the parts of the instrument sensors – such as the pressure tap pipes in orifice flow meters, or the vortex generators used in vortex flow meters
Reply #72018-05-23
Pipes that have not been modified are acceptable; those that have been modified must first be purged and pressure-tested, and cannot be pressure-tested simultaneously with the gauge
Reply #82018-05-23
Pressure testing is possible, but it is necessary to check whether the pressure rating of the instruments meets 1.5 times the design pressure of the pipeline
Reply #92018-05-24
Sure, you can conduct a pressure test after the purging is complete, as long as the instruments don’t exceed their limits.
Reply #102018-05-24
Yes, when selecting instruments, the pressure rating is usually one level higher than the design pressure of the pipes; even if the pressure rating is the same as that of the pipes, a pressure test at 1.5 times that pressure is allowed.
Reply #112018-05-24
In fact, it’s not just a 1.5 times factor; when the operating temperature is very high, an additional coefficient is applied. Please refer to section 10.3 of GB50517

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.