Now, all chemical industries are required to establish dual-system frameworks, involving the identification of risk areas and risk points in each workshop and at each job position; In our company, the risk points within the instrumentation department include thermometers, level gauges, flow meters, pressure transmitters, control valves, gas detectors, DCS operation stations, DCS control stations, and so on ; But I don’t think this is very reasonable; if those measurement points are assigned to the instrumentation department, I won’t have anything else to do – I’d just have to check all of them, and that alone would take up the whole day ; I think these should be divided by workshop; for example, the phthalic anhydride workshop can be split into: oxidation area, hot-melting area, refining area, slicing area, fan room, and so on ; The corresponding instruments are located in the respective areas, and should not be considered separately as risk factors for the instrumentation department ; The instrument workshop is similar in nature to the process technology department and the maintenance workshop; all I need to do is keep daily work records, maintenance records, and inventory logs for the instruments. It’s no longer possible to do this work; if all of these are considered risk points for the instruments, how can we proceed? I would be extremely grateful if the experts could provide some guidance.
This post was last edited by alasnow on 2018-8-9 at 16:44. Risk control measures: Project – Replacement and installation of flammable and toxic gas detectors. Control code: Risk level – Level 4. Engineering and technical measures: “1. Develop safety and technical measures in accordance with the equipment maintenance procedures and construction operation guidelines.” 2. Operate strictly in accordance with the operating procedures and construction work procedures. 3. The settings shall comply with relevant requirements such as the \"Design Code for Detection and Alarm of Flammable and Toxic Gases in Petrochemical Industries\" (GB50493-2009). 4. The technical requirements for installation and wiring shall comply with the provisions of the manufacturer, as well as the relevant requirements of the current **standard \"Code for Design of Electrical Installations in Explosive and Flammable Environments\" GB50058. " Safety management measures: “1. Operate strictly in accordance with safety procedures.” 2. Strictly adhere to the requirements of various special operation specifications. 3. Obtain all the necessary tickets and permits. 4. Construction work may proceed only after various safety measures have been implemented and verified. 5. The guardian shall strictly fulfill their guardianship duties. " Training measures: “1. Operators must thoroughly receive training on the operating procedures.” 2. Organize the three-level training and education carefully, and maintain a record sheet. 3. Organize training on safety technical measures for maintenance, and obtain confirmation signatures. " Emergency measures: “1. In the event of a large-scale leakage of toxic, flammable, or explosive gases, the emergency plan should be activated immediately to evacuate people.” 2. In the event of major process or equipment failures, immediately initiate an emergency shutdown procedure. " Protection measures: “1. Operators must wear appropriate personal protective equipment strictly. 2. Wear the appropriate personal protective equipment strictly during special operations. 3. Equipped with portable combustible gas or toxic gas detection alarms. "
If you don’t know what to do, then don’t do it outside. . . . It’s too hot; let’s take a break from the strike. :P