Thread Content
This post was last edited by 955559 on 2018-8-14 at 17:27. Hello, everyone on Haichuan Network: Due to a new project, our management has ordered that bidding preparations be started in September. The bidding includes pressure-type, temperature-type, level-type, and pneumatic valve types. Reputable domestic brands or joint-venture brands are all acceptable. Note: For domestic products, no agents are needed; please contact us via private message if interested.
The bidding process first requires specifying the requirements for the instruments needed, and then drafting the technical bidding documents.
Preparing the tender documents – what’s the rush?
Hehe, there are still people who do projects in this way; they should conduct their own research on the usage of similar equipment and instruments, understand the problems that arise and the solutions for them, and then choose the manufacturers to be invited to bid based on that information. If we do this now, everyone will rush in at once; I guess you won’t be able to handle it then, with all kinds of relationships coming into play. . . . ;P
This method of bidding is even less sophisticated than soliciting prostitutes. At the very least, you should list your height, appearance, body measurements, and the features of your services in order to attract potential clients. A bid written like yours is not even as noticeable as the sign of a foot massage parlor.
It is necessary to specify one’s requirements, functions, purposes, whether remote control is needed, whether interlocking is required, pressure rating, the medium used, and so on
There’s no information on what the project is, what the requirements are, or any specifications or anything like that