HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

I seek advice from the experts in instrumentation

2018-09-18View Original

Thread Content

Using a Siemens S7-300 program, with 1 input for delaying the activation of the timer and 2 delays for shutting it down, the following functions are achieved:
Reply #22018-09-18
Eagerly awaiting the answers from the elites.
Reply #32018-09-19
This post was last edited by zzllyp on 2018-9-19 at 15:31. A falling edge was used; one delay switch was omitted. Simulation was successful; M1.6 was used in place of Y1
Reply #42018-09-20
I am extremely grateful for zzllyp’s answer; my sincere thanks.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.