HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Help needed: installation of pressure gauge on pressure vessel

2019-10-31View Original

Thread Content

Is it in compliance with the standards to have a backflow pipe installed on the pipeline leading from the pressure gauge of the tank pump in the workshop, in order to prevent the filter screen from getting clogged? Can’t it be installed? The people in my department say that my equipment doesn’t meet the standards and have ordered it to be corrected. . .
Reply #22019-10-31
So, is it using the branches of the pressure gauge tube for backwashing? It’s best to revert to the original design. If rectification is needed, you can confidently submit a report requesting the equipment department to contact the manufacturer for a new design. It is reasonable to require rectification, as there may be a difference between the pressure in the backflow pipe and the actual pressure indicated inside the tank.
Reply #32019-10-31
No, it was designed that way originally; the drawings didn’t provide such detailed specifications, and the equipment department said that this design had no basis and requested that it be changed. .
Reply #42019-11-01
As long as there is no overpressure, it can be installed in this way. The regulations require that a pressure gauge be installed on the root valve, and the purge line also needs to have a root valve; it should be closed when purging is not in use
Reply #52019-11-01
Hello! Our company specializes in the production of elbows, shrimp-shaped elbows, hot-dip galvanized pipe fittings, medium-frequency bent pipes, high-pressure flanged connections with necks, blind plates, tube sheets, tees, reducers, various standard manholes, desulfurization flue gas dampers, supports and hangers, compensators, metal hoses, end caps, rubber joints, pipe supports, flare fittings, as well as custom-made pipe fittings for complex projects. The materials used include carbon steel, alloy steel, and stainless steel. (Vast inventory in stock, high quality and quantity at low prices! ! ! ) Inquiry hotline for negotiations: 17731768234, 13833747555 (same as WeChat ID)
Reply #62019-11-02
May I ask, what standard is this? Could you tell me?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.