Documentation required for instrument acceptance

2020-01-08View Original

Thread Content

When starting a new project, as an instrumentation technician, what kinds of certificates and documents are generally required from the manufacturer during the acceptance inspection of the instrumentation upon its arrival?
Reply #22020-01-08
Certificates, user manuals, and other relevant documents. Imported equipment requires relevant supporting documents such as customs declarations. During the inspection, you need to compare the signed technical agreement with the equipment on site item by item, checking parameters, materials, and other details.
Reply #32020-01-08
How is the quality of materials generally inspected?
Reply #42020-01-09
Material inspection requires specialized equipment; it’s not possible to determine this just by looking. On-site inspection mainly focuses on the appearance and model.
Reply #52020-01-10
If it is an explosion-proof instrument, an explosion-proof certification for the instrument is required, along with the accompanying documents of the instrument itself, etc
Reply #62020-01-10
Is it necessary for the manufacturer to provide proof of the material, etc.? Are there also valves, and are certificates such as pressure testing and leakage testing for valves required?
Reply #72020-01-10
Is it necessary for the manufacturer to provide proof of the material, etc.? Are there also valves, and are certificates such as pressure testing and leakage testing for valves required?
Reply #82020-01-11
Please refer to the Automation Instrumentation Acceptance Specifications
Reply #92020-01-12
Back then, Sanlu was a **product that did not require inspection, yet it still caused harm without any doubt. There’s no proof whatsoever – absolutely no evidence at all. Test the instrument by yourself – its advantages and disadvantages will be clear at a glance, which is better than any proof. . .
Reply #102020-01-13
The test materials should be random samples, and the valve leakage tests should be conducted before the product leaves the factory; if a pass certificate is required for these tests, it may incur additional costs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.