HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How should various electrical devices be started in an orderly manner after the diesel generator is started?

2020-05-07View Original

Thread Content

I have a question for the teachers: from the moment the normal power supply to the factory is cut off until the diesel generator starts up, there is a period of about 10 seconds during which no power is available; during this time, all electrical equipment stops working. May I ask, once the diesel generator is successfully started, how are the devices that need to be restarted in order to ensure the safe shutdown of the system restarted? Is it needs to be manually restarted by a person, or automatically started by a program? I would like to ask: in the DCS logic used in engineering projects, is there a function that allows for the automatic sequential startup of relevant equipment once a diesel generator is started?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.