Process Engineering Division – Instrumentation and Automation Section – Daily Question – Question from 2020-08-01: Discussion question: 193. What are the steps to deactivate a differential pressure transmitter?
Reply #22020-08-03
For differential pressure transmitters with complete piping systems, to shut down completely from the operating state: open the balance valve; Close the positive pressure valve ; Close the negative pressure valve ; Close the two root valves ; Open the two drain valves ; Close the two drain valves ; Stop powering the transmitter.
Reply #32020-08-03
Open the balance valve; Close the positive pressure valve ; Close the negative pressure valve ; Close the two root valves ; Open the two drain valves ; Close the two drain valves ; Stop powering the transmitter.
Reply #42020-08-03
Close the shut-off valve, then open the balance valve for drainage, and then shut it down
Reply #52020-08-03
Close the positive pressure tap valve, open the balance valve, close the negative pressure tap valve, and finally close the root valve.
Reply #62020-08-03
Close the negative pressure valve, open the balance valve, close the positive pressure valve
Reply #72020-08-03
Open the balance valve, close the negative pressure side, and close the positive pressure side.
Reply #82020-08-03
Open the balance valve; Close the positive pressure valve ; Close the negative pressure valve ; Close the two root valves ; Open the two drain valves ; Close the two drain valves ; Stop powering the transmitter.
Reply #92020-08-03
Open the balance valve, close the negative pressure side, and close the positive pressure side.
Reply #102020-08-03
For a differential pressure transmitter with complete piping, to bring it completely out of service: open the balance valve; close the positive pressure valve; close the negative pressure valve; close the two root valves; open the two drain valves; close the two drain valves; cut off power to the transmitter.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.