Cable laying in the fire control room on the first floor

2022-03-10View Original

Thread Content

The fire control room on the first floor is equipped with a fire alarm control cabinet, a DCS cabinet, and operation consoles. Is it acceptable to use direct cable trays inside the room? It seems that anti-static raised flooring is not suitable for use on the first floor
Reply #22022-03-11
A cable trench works fine; it’s just necessary to consider the drainage issue in conjunction with the civil engineering work.
Reply #32022-03-11
Cable trays have their advantages too; at least they are much better at preventing water damage. Anti-static floors are also convenient
Reply #42022-03-11
A partial anti-static floor can be installed under the cabinets, while terrazzo flooring can be used in other areas.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.