After the coke oven was shut down, it is now planned to resume operation; how should production be organized?

2017-04-23View Original

Thread Content

Due to the warming market, there are certain opportunities; coking enterprises that have been shut down for half a year wish to resume operations. How should a plan for resuming production be formulated? Please advise
Reply #22017-04-29
It’s better to leave this to professionals.
Reply #32017-04-29
Not many people have this kind of experience. As far as I know, the Hanzhong Iron and Steel Coking Plant stopped production for a year and has only been operating again for a few months; you can communicate with them
Reply #42017-04-30
It’s similar to when a newly built coke oven starts operating. The furnace needs to be reheated.
Reply #52017-05-02
In coke plants that have ceased operations, the coke ovens are also shut down and have cooled to room temperature. At this time, if production is to resume, the biggest issue lies with the furnace. When the coke oven is cooled from a temperature of over 1300 degrees during production to normal temperatures, cracks of varying degrees will inevitably appear inside and outside the oven. For a coke oven in use, integrity is of paramount importance; otherwise, nothing else can function properly. It is necessary to repair the oven body and flues from the inside out while it is cold, and in some cases, bricks must be replaced to ensure that the integrity meets the requirements for production ; The second step is to bake the furnace. Then there are various devices on the furnace body, such as tie rods, springs, furnace columns, protective plates, rise pipes, exchange systems, etc.; any faulty devices should be replaced while the furnace is at room temperature. It’s quite troublesome anyway; the investment requires tens of millions or even hundreds of millions. My friend helped me get the furnace in Hanzhong up and running again; if you have any further ideas, feel free to reply to me here.
Reply #62017-05-02
This is a highly specialized and complex project; it is best to have professionals provide guidance throughout the process.
Reply #72017-09-03
The possibility of resuming operation is low; there is severe leakage from the furnace, with smoke coming from everywhere, mainly due to failure to meet environmental standards. It’s called the Environmental Protection Law now!
Reply #82019-10-15
What is the production capacity? What is the height of the carbonization chamber in a coke oven?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.