Can the coking main control room be located on the first floor of the interlayer?

2018-11-07View Original

Thread Content

Can the coking main control room be located on the first floor of the interlayer? Since the explosion zone is classified as Zone 2, I checked the coking safety regulations as well as GB50058-2014, but found no answer!
Reply #22018-11-13
The design now does not allow it to be installed on the first floor; it must be installed on the second floor
Reply #32018-11-14
Are there any relevant standards or specifications?
Reply #42018-11-19
Why not? It depends on how your design is laid out in the drawings, or on the local safety regulations

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.