The Jinhua Furnace 3.0 in the Xinjiang Zhongtai New Materials Resource Utilization and Upgrading Demonstration Project for Coal-to-Methanol Production successfully passed the 72-hour performance test

2026-01-01View Original

Thread Content

Recently, the resource utilization and comprehensive upgrading demonstration project for producing coal-to-methanol at Xinjiang Zhongtai New Materials Co., Ltd. made key progress, with the Jinhua Furnace 3.0 successfully passing a 72-hour performance test. Under the joint witness of the owner, designer, and process package provider, the evaluation results showed that the unit operates stably, and all technical indicators of the Jinhua Furnace meet or exceed the design values. During the 72-hour continuous testing period, key parameters of the Jinhua Furnace 3.0, such as processing load, gasification efficiency, carbon conversion rate, and the effective components of syngas, performed excellently. This technology has successfully achieved a simultaneous increase in both the high carbon conversion rate and the comprehensive energy utilization efficiency of the system. The gasification unit of the Resource Comprehensive Utilization and Upgrading Demonstration Project for Methanol Production from Coal by Xinjiang Zhongtai New Materials Co., Ltd. utilizes the technology of the coal-water slurry water-cooled wall waste heat boiler gasifier (Jinhua Furnace 3.0) developed by Beijing Qingchuang Jinhua Technology Co., Ltd. Two in operation and one on standby. The gasification pressure is 6.5 MpaG, and the total gas volume is 280,000 Nm3/h (CO+H2). The construction site of the Xinjiang Zhongtai New Materials Resource Utilization and Upgrading Demonstration Project for Coal-to-Methanol Production is located within the Tongxin Industrial Park in Alehui Town, Toksun County, Xinjiang. The project utilizes the waste gas and residues (coke powder and coal dust) generated as by-products from the existing semi-coke production facility operated by Zhongtai Group in Toksun County as raw materials to build a methanol production plant with an annual capacity of 1 million tons. Project Overview
Project Name: Resource Recovery and Comprehensive Utilization for Methanol Production – Upgrading Demonstration Project of Xinjiang Zhongtai New Materials Co., Ltd.
Nature of Construction: New construction
Location: Tongxin Industrial Park, Alehui Town, Toksun County, Turpan City
Scale of Construction: An annual production capacity of 1 million tons of methanol
Construction Content: The project uses waste gas and undersize materials (coal powder and coke fines) as raw materials to produce methanol. The planned production capacity is 1 million tons of refined methanol per year, along with by-products including 25,000 tons of sulfuric acid, 1,500 tons of ammonia water, 15,000 tons of industrial sodium chloride, and 3,000 tons of mirabilite. The construction scope mainly includes air separation units, gasification units, shift and purification units, sulfur recovery units, and methanol production units. Complementary utility and auxiliary projects include gas protection and fire stations, waste heat utilization systems, a 110 kV main substation, a water treatment plant, a circulating water station, a demineralized water plant, steam boilers, heat exchange stations, administrative offices, auxiliary production areas, auxiliary warehouses, and flares. Storage and transportation facilities such as a coal conveying system, liquid loading/unloading stations, methanol tank farms, and acid/base tank farms have also been constructed. Additionally, environmental protection facilities like a sewage treatment plant, a temporary storage facility for general solid waste, and a temporary storage facility for hazardous waste have been built.
Reply #22026-01-01
Happy New Year 2026! ! ! ! https://bbs.hcbbs.com/thread-5710045-1-1.html (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #32026-01-01
[Common issues in Haichuan pipeline design] Compilation post; currently being updated with text and images. Everyone is welcome to join the discussion. https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #42026-01-02
[HaiChuan Safety Discussion] Compilation of potential hazards around us – illustrated with pictures and texts. Everyone is welcome to join the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #52026-01-02
【Ten Years of Great Development in Chemical Equipment】 Construction has begun on the world’s largest onshore membrane-type LNG storage tanks from 2025 to 2026; the three tanks will have a combined gas storage capacity of 470 million cubic meters. https://bbs.hcbbs.com/thread-5710051-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-02
【Ten Years of Great Development in Chemical Equipment】2947-2026: Using waste resources as raw materials, China’s largest project for producing methanol from waste – the 100,000-ton/year green methanol project by Shanghai Huayi – has been successfully put into operation. https://bbs.hcbbs.com/thread-5710101-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #72026-01-03
【Ten Years of Great Development in Chemical Equipment】 From 2949 to 2026, China’s first ethane recovery and co-production project for LNG was completed at the Daniudi Gas Field in Yulin. https://bbs.hcbbs.com/thread-5710164-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #82026-01-03
[History of Haichuan Chemical Industry] The engine of civilization: A millennium-long evolution history of pumps https://bbs.hcbbs.com/thread-5710250-1-1.html (Source: Haichuan Chemical Industry Forum (Huahai Chuanliu hcbbs))
Reply #92026-01-04
【Ten Years of Great Development in Chemical Equipment】 From 2948 to 2025, this world-leading technology for converting straw into green methanol has taken root in Linquan County. https://bbs.hcbbs.com/thread-5710105-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #102026-01-04
【Ten Years of Great Development in Chemical Industry Equipment】 From 2942 to 2025, China’s first domestically produced 300-megawatt-class heavy-duty gas turbine was put into operation. https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112026-01-05
【Ten Years of Great Development in Chemical Equipment】 From 2951 to 2025, China’s first thousand-ton-scale green and intelligent production line for producing carbon nanotubes from natural gas was successfully put into operation. https://bbs.hcbbs.com/thread-5710299-1-1.html (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.