Vertical height from the space furnace gasification mill to the large bag

2019-12-11View Original

Thread Content

What is the vertical height from the mill outlet to the large bag in pulverized coal gasification processes? If it’s too high, what are the disadvantages? Our design should have a vertical height of 80m.
Reply #22019-12-17
I haven’t paid attention to this yet, but I think the coal powder exported from the large bags needs to have a sufficient transmission distance to reach the atmospheric-pressure powder silo; perhaps the height of this silo indirectly determines the installation height of the large bags
Reply #32019-12-17
Well, I’ve seen Shell’s layout, and the height difference there is even greater than ours
Reply #42019-12-22
If it is too high, the work done by the circulation fan increases; if it is too low, the distance for transport from top to bottom may not be sufficient. Our coal grinding floor has 18 levels, making it 108 meters high, and the distance from the mill outlet to the large bag is probably around eighty or ninety meters as well.
Reply #52019-12-22
Thank you very much; it seems we were overthinking it
Reply #62019-12-26
In my opinion, the main considerations should be the installation height of the atmospheric pressure powder bin, the variable-pressure lock hopper, and the high-pressure coal hopper, to ensure proper material discharge; another factor is the distance limitation for slurry transport.
Reply #72019-12-27
Thank you very much for the reminder. So, for the dense-phase conveying over the vertical distance from the mill to the large bag, what volume of air and what pressure head are required?
Reply #82020-12-20
The coal grinder must definitely be placed on the first floor. The large bags cannot be placed too low, as there are coal storage tanks, hoppers, and feed tanks below them. In other words, the energy efficiency of the coal grinding unit is sacrificed in order to ensure the operation of the coal pulverization under pressure unit.
Reply #92020-12-20
The coal grinder must definitely be placed on the first floor. The large bags cannot be placed too low, as there are coal storage tanks, hoppers, and feed tanks below them. In other words, the energy efficiency of the coal grinding unit is sacrificed in order to ensure the operation of the coal pulverization under pressure unit.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.