How to address the high temperature of wastewater discharged from gasification?

2022-06-16View Original

Thread Content

How to address the high temperature of wastewater discharged from gasification? The wastewater cooler gets clogged frequently, resulting in poor heat exchange and high wastewater temperatures
Reply #22022-06-20
We have added a set of horizontal wastewater coolers; each time the vaporization furnace is serviced, one set out of the three sets is taken offline for high-pressure cleaning
Reply #32023-04-28
1. Control the flash pressure properly to increase the true flash vacuum level. 2. Have a backup wastewater heat exchanger available for use in substitution. 3. Install a pipe from the outlet of the sump flushing tank heat exchanger to the external drainage pipe; when the wastewater heat exchanger is not effective at performing heat exchange, use the flushing tank heat exchanger to cool the wastewater before discharging it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.