Thread Content
This post was last edited by HaiChuanLaoYu on 2026-5-24 at 11:01. The 25th National \"Safety Production Month\" in 2026: Everyone should talk about safety and know how to handle emergencies; identify and address potential risks and hazards. -------------------------------------------------- 7. What are the reasons for chaotic document numbering, and how should such issues be dealt with? Answer: By \"disordered notes,\" it is meant that certain furnace numbers cannot discharge coke in accordance with the prescribed sequence for coke pushing, thereby disrupting that sequence. The reasons for the irregularities are as follows: in some cases, the furnace temperature was abnormal; the coke cake had not yet matured after the specified time, so further heating was required, which extended the coking time ; Pushing the secondary focus affects the accurate extraction of the focus ; Repair is carried out in individual furnace holes, requiring an extension of the coking time for adjacent carbonization chambers ; Change the coke pushing sequence; for example, change it from 5-2 to 9-2, or from 9-2 to 5-2. Due to the messy notes, the uniformity of the heating temperature is compromised, and it’s easy to mistake the furnace number; this makes the operation time-consuming and cumbersome. It’s also not possible to ensure that adjacent carbonization chambers have a half of the coking time. Therefore, it is necessary to adjust the disorderly notes as soon as possible so that coke extraction from the coke ovens can proceed in sequence. The method for adjusting messy papers is to first check the conditions related to paper loss before dealing with the messy papers, fully consider both favorable and unfavorable factors, and explain them clearly to the operators. In addition, it is also necessary to prevent production disconnection. For example, the coal blending system ensures a steady supply of coal, while the coking screening system guarantees that coke is transported out in a timely manner. Previously, the time of each batch release was advanced, so that the furnace numbers of the disordered batches were gradually moved forward to their original positions in the sequence. As previously mentioned, each furnace group may increase the number of furnaces operated per hour by no more than two compared to the normal schedule, and no more than 4 furnaces per shift. This is mainly done to keep the production operations as uniform and stable as possible, without any loss of furnace runs. The specific method is as follows: when two coke ovens share one coke quenching vehicle, the coals for two ovens are pushed in and installed quickly in succession, which allows one oven to be processed first ; When spare quenching cars are available, two quenching cars can work together to receive and quench coke until operations are back on schedule ; If another coke oven is under maintenance, it is possible to use the method of pushing out the oven; it generally takes 8–10 minutes to complete the process for one oven, and in faster cases 6–7 minutes, which makes it easy to keep up ; If both coke ovens need to be accelerated in their production process, it is necessary to work against time to catch up, while ensuring safe production at all times. Falling backward means that when it’s time for the item to be taken out of the furnace, it doesn’t come out, causing it to fall backward and return to its original position in the sequence. When falling backward, the coking time should not be longer than 3 hours compared to the specified coking time. This method allows for a rapid return to the original position, but the downside is a loss of furnace count; care must be taken to control the temperature of adjacent units. When adjusting the disordered sheets, the following should be noted: (1) When making such adjustments, it is strictly prohibited to push coke out from adjacent carbonization chambers continuously within 1–2 hours, as this will cause a sharp drop in furnace temperature and damage the furnace structure. (2) Pay attention to the temperature of adjacent combustion chambers to prevent low-temperature or high-temperature accidents. (3) Check the coke pushing situation, paying attention to comparing it with the normal magnitude of the coke-pushing current. If the current is too high and it is difficult to push the coke cake, it should not be moved forward but rather pulled back. (4) Decide on advancing or delaying based on the progress of the production tasks.
【Haichuan Teahouse】What kind of cuisine is this from? It looks really delicious! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721303 (Source: Haichuan Chemical Engineering Forum (HCBBS))
[HaiChuan Construction Drawing Review] Summary Post -- Understand the requirements for drawing review and improve standardized design. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721370 (Source: HaiChuan Chemical Forum (HaiChuan Chemical Flow hcbbs))
【Haichuan Teahouse】A collection of common marine fish in Chaoshan – which one do you like? ( VII ) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721491 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[HaiChuan Safety Forum] Hidden hazards around us – The width of the insulating mat in front of the distribution cabinet does not meet the requirements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721519 (Source: HaiChuan Chemical Engineering Forum (HCBBS))
【Common Issues in Haichuan Pipeline Design】Ignoring the small dead space between the rupture disc and the safety valve can create fatal safety hazards. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721547 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【In-depth Discussion on Haichuan’s Modular Installation】Successful shipment of Module No. 1 for the wharf tunnel in Indonesia’s CAA-1 caustic soda project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721596 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Chemical Valve Management】Series Posts–Guide to High-Pressure Valve Design and Engineering https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721627 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Haichuan Illustrated Chemical Equipment】 Series Posts -- Trickle Bed Reactor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721650 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
[Haichuan’s Guide to Chemical Equipment] Series Post – Scraper Filter https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721706 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Haichuan Teahouse】The Authentic Flavor of Shantou – Miancheng Turtle Cake https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721721 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))