Public announcement on the environmental impact assessment for Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd.’s 1 million tons per year methanol production project

2025-07-16View Original

Thread Content

On July 10, the Guizhou Provincial Department of Ecology and Environment made public information regarding the environmental impact assessment documents for the 1 million tons per year methanol production project of Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd., which were submitted for review. Project Name: Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd.’s 1 million tons per year methanol production project. Constructor: Sinopec Great Wall Energy Chemical (Guizhou) Co., Ltd. Location: It is situated within the Zhijin New Energy Chemical Industry Base in Chadian Bu Yi Miao Yi Township, Zhijin County, Bijie City, Guizhou Province, 27 km away from Zhijin County town. The coordinates of the project’s center point are 105.779612 degrees east longitude and 26.887534 degrees north latitude. Main products: 1 million tons per year of methanol produced from coal (based on pure methanol). The main process production units include: 3×1,500-ton/day gasification units, a purification unit with a capacity of 315,000 Nm3/h, a sulfur recovery unit with an annual capacity of 40,000 tons, a methanol production plant with an annual capacity of 1 million tons (including compression, synthesis, distillation, and hydrogen recovery), as well as an air separation unit with a capacity of 70,000 Nm3/h. In addition, there are various supporting utility systems and auxiliary production facilities.
Reply #22025-07-17
【Ten Years of Great Development in Chemical Equipment】The 2531-2025 Donghua biomass pressurized gasification technology project has been launched; the gasifier used in Donghua Technology’s biomass gasification pilot project has been installed. https://bbs.hcbbs.com/thread-5696767-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-07-17
【Ten Years of Great Development in Chemical Equipment】The 2531-2025 Donghua biomass pressurized gasification technology project has been launched; the gasifier used in Donghua Technology’s biomass gasification pilot project has been installed. https://bbs.hcbbs.com/thread-5696767-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-07-19
【Haichuan Teahouse】The three-colored pillar at the entrance of the Yangzi Petrochemical Plant https://bbs.hcbbs.com/thread-5697064-1-1.html (Source: Haichuan Chemical Forum)
Reply #52025-07-21
【Frontiers in HaiChuan Chemical Technology】Synthesis of high-purity phase metal intercalide catalysts; Tsinghua University team makes significant progress in the research on selective hydrogenation of alkynes https://bbs.hcbbs.com/thread-5697126-1-1.html (Source: HaiChuan Chemical Forum)
Reply #62025-07-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】2547-2025: Shangguo’s Taonan Wind Power and Biomass Integrated Green Methanol Production Demonstration Project – 2000 m³ Medium-Pressure Hydrogen Sphere Tank https://bbs.hcbbs.com/thread-5697145-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-07-21
【History of Haichuan Chemical】The Pioneer of Zigong’s Well Salt Chemical Industry – Sun Xuewu https://bbs.hcbbs.com/thread-5697180-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-07-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, China will have developed its own 3,000-meter-class emergency recovery devices for ultra-deep-water submarine pipelines; these devices will be put into use. https://bbs.hcbbs.com/thread-5697294-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-07-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2552–2023: China’s ultra-deep-water gas field, “Deep Sea No. 1”, saw the completion of its first ultra-deep-water pipeline cleaning operation. https://bbs.hcbbs.com/thread-5697303-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #102025-07-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】2553–2023: China’s First 3,000-meter Ultra-Deep Water 3D Seismic Survey Completed https://bbs.hcbbs.com/thread-5697304-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.