The lining work in the MTO area of the Jiutai project has entered its second phase

2018-11-26View Original

Thread Content

The heating process in the MTO section of the Jutai project has entered its second phase. Author/Source: Yaha Coal Chemicals. Date: November 25, 2018. Clicks: 12. On November 22, the constant-temperature heating at 150°C in the reactor, regenerator, buffer tanks, and start-up heater of the MTO unit at the Jungeer Company in Inner Mongolia was completed; the regenerator and start-up heater have now entered the phase of constant-temperature heating at 350°C. The reactors, regenerators, buffer tanks, and startup heaters were subjected to heating at a constant temperature of 150°C, which effectively removed the free water from their linings; the heating at 350°C carried out this time increased the temperature from 150°C to 350°C in order to remove the crystalline water from the linings. As of the time of writing, the regenerator and the heating furnace in operation are being heated at a rate of 8–10°C per hour; the temperature has now reached 260°C. The reactor and buffer tank have been fed with nitrogen to maintain a constant temperature of 150°C. Once the regenerator reaches a constant temperature of 350°C, the reactor and buffer tank will begin to be heated to 450°C. It is understood that the regenerator needs to undergo constant-temperature baking in three stages at 150°C, 350°C, and 650°C. During the baking process, the personnel in charge of processes, equipment, and safety work closely together, and the operators follow the baking plan strictly to ensure that the baking work proceeds safely, smoothly, and without issues.
Reply #22018-11-27
If the lining process is not controlled properly, the lining will crack next spring, affecting operation.
Reply #32018-11-27
If the lining process is not controlled properly, the lining will crack next spring, affecting operation. The overall construction progress still isn’t well controlled.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.