HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Zhenhai Refining & Chemical’s newly built coal-coke hydrogen production unit has started producing hydrogen on a commercial scale

2019-01-30View Original

Thread Content

Zhenhai Refining & Chemical’s new coal-coke hydrogen production unit has started producing slurry on a commercial scale. Author/Source: Date: 2019-01-25 Clicks: 97. After nearly 3 months of intensive testing, the coal grinding and slurry production unit of Zhenhai Refining & Chemical’s new coal-coke hydrogen production unit began to produce slurry on a regular basis on January 21, generating qualified coal slurry. This marks the successful completion of the testing phase for this unit, representing a key step forward in the commissioning of the entire facility. On December 28, 2018, the coal-coke hydrogen production unit at Zhenhai Refining & Chemical Co., Ltd. was successfully commissioned. The unit is capable of producing 120,000 standard cubic meters of hydrogen per hour; its operation will further optimize the hydrogen balance at Zhenhai Refining & Chemical Co., Ltd. Coal grinding and slurry preparation is a critical step in the commissioning of coal-to-hydrogen production facilities; the ratio of the coal slurry and the quality of the resulting slurry directly affect the hydrogen production efficiency of the misting units and gasification units after feeding the slurry into the system. As this was the first time coal grinding equipment was being used, the startup team faced difficulties such as a lack of operational experience and high challenges in commissioning during the initial testing phase. Based on in-depth studies of the commissioning experiences of similar units at sister companies such as Jiujiang and Maoming, the Chemical Department of Zhenhai Refining & Chemical Co., Ltd. formulated a reasonable trial operation plan. Through the joint efforts of all personnel at the facility, tests were carried out on the coal grinder interlocks, as well as trials at no load, 50% load, and 90% load. The issues related to the grinder interlocks, problems with the lubricating oil return system, and coal slurry mixing ratios were resolved, ensuring the successful completion of the commissioning process for the coal grinding and slurry preparation unit.
Reply #22019-01-31
It seems the POX unit is ready to start up.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.