HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Review of two coal chemical projects in Yulin with a total investment of over 12 billion yuan

2020-01-03View Original

Thread Content

Total investment of over 12 billion yuan in two coal chemical projects in Yulin – Review Article/Source: Huahua Network Coal Chemicals Date: 2020-01-02 Clicks: 71 On December 27, a coordination meeting was held in Xi’an to review the overall plans for Yanchang Petroleum Yushen Energy Chemical Co., Ltd.’s 500,000 tons per year coal-based ethanol project, as well as the first phase of Shaanxi Yulin Energy Group Co., Ltd.’s coal-based project to produce 1.2 million tons per year of ethylene glycol, with an initial capacity of 400,000 tons per year. Ma Fei, deputy director of the Yushen Industrial Zone Management Committee, relevant officials from the Planning and Construction Bureau, five invited experts, as well as representatives and engineering technicians from Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd., Shaanxi Yulin Energy Group Co., Ltd., Beijing Petrochemical Engineering Co., Ltd., and China Tianchen Engineering Co., Ltd., attended the meeting. At the meeting, the attendees listened to presentations by the two design firms on the design of the project’s general layout and held thorough discussions. The expert group agreed that industrial zones should take transportation planning into consideration comprehensively, define the flow paths for people and goods within the zone, and provide a basis for the overall layout of the projects. When planning the layout of such projects, due attention must be paid to the impact of elevated flares on adjacent enterprises. Ma Fei, deputy director of the management committee, emphasized that the Yushen Industrial Zone should strive to become a world-class coal chemical industry park, while strictly adhering to the principles of safety and environmental protection. All project constructors and design firms must, when planning the overall layout and transportation systems, follow the requirements of integrating safety and environmental considerations as well as logistics and transportation. They need to take into full account the impact of the project’s layout on the overall plan of the zone and on neighboring enterprises, strengthen communication with the management committee and those enterprises, ensure that human and material flow is managed in a scientific and rational manner, and properly balance the safety of individual enterprises with the overall safety of the zone.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.