HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The desalination unit of the Auxiliary Engineering Project Department at Yulin Chemical has successfully produced water

2021-04-08View Original

Thread Content

The desalination unit of the Auxiliary Projects Department at Yulin Chemical has successfully produced water. Author/Source: Yulin Chemical Company, Shaanxi Coal Group. Date: April 8, 2021. Clicks: 4. At 00:50 on April 6, the initial trial operation of the desalination station at Yulin Chemical’s Auxiliary Projects Department was successful, with qualified desalinated water being produced for the first time, indicating that the station now has full capacity for desalination. This raw water treatment desalination system uses multi-media filters, ultrafiltration, reverse osmosis, mixed-bed reactors, and double-bed reactors to treat raw water into qualified desalinated water that meets the standards for boiler feedwater. The raw water treatment capacity of this facility is 2,300 m3/h, and once it is fully operational, the annual water production volume will reach 19.87 million tons. As of the time of writing, the water output from the device is stable and meets the standards. To ensure the smooth commissioning of this equipment, the Public Auxiliary Engineering Project Department, in collaboration with equipment manufacturers, construction units, supervision agencies, and other technical professionals, carefully controlled every stage of the process. From plan formulation and process control to goal achievement, the procedures were carried out strictly in accordance with the commissioning plan. The entire commissioning process was conducted in a systematic, orderly, safe, and reliable manner, allowing for the successful completion of tasks such as individual equipment testing, as well as the purging, cleaning, pressurization, defect correction, and debugging of storage tanks and pipelines, within a relatively short period of time. As a key component of the public auxiliary facilities construction project, the demineralized water station is also an essential part of the 180-ton/year ethylene glycol production facility. Its successful commissioning will facilitate the proper startup of the boilers, while also providing a solid foundation for the smooth operation of the main equipment later on.
Reply #22021-04-08
What about the operating costs? The response time can’t be low

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.