HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The high-quality by-product crystalline salt has been successfully produced as a result of the concentrated salt water separation and crystallization project carried out by Northwest Energy & Chemical Company

2021-06-07View Original

Thread Content

The project on fractional crystallization of concentrated brine at Northwest Energy and Chemical Company has successfully produced high-quality crystalline salt as a by-product. Author/Source: Woshou Wanmei Coal; Date: June 7, 2021; Views: 7. On April 26, the fractional crystallization unit at Northwest Energy and Chemical Company completed its entire operational process, enabling effective separation of salts from high-salinity wastewater. The completion and operation of the device for high-concentration saltwater quality-controlled crystallization mark a milestone, as it enables Northwest Energy & Chemical Company to achieve zero discharge of industrial wastewater. This is of great significance for protecting the Yellow River basin, promoting the recycling of corporate resources, and carrying out comprehensive pollution control. It represents a clear demonstration of the company’s commitment to the principle that \"lucid waters and lush mountains are invaluable assets\" in its pursuit of sustainable and high-quality development. Since the project began construction, it has received strong support from the local **departments and the group company. During the construction process, Shenzhen Energy Resources Comprehensive Development Co., Ltd., China Light Industry Changsha Co., Ltd., and the company’s project team overcame a series of engineering challenges, including the complexity of the underground pipeline networks, the large geographical extent of the project, and the limited space available for construction. In particular, the company’s project team and the construction contractors overcame the impacts of the COVID-19 pandemic on the supply of construction materials, equipment transportation, and the construction workforce, achieving various goals such as a successful one-time installation of the evaporator, a successful power-up on the first attempt, and zero production safety incidents, thereby ensuring the smooth completion and commissioning of the project. The project is under EPC general contracting by Shenzhen Energy Resources Comprehensive Development Co., Ltd. Its design processing capacity is 40 cubic meters per hour. It employs a domestically advanced, mature, and reliable process that consists of a pretreatment and membrane concentration unit as well as an evaporation crystallization unit; this allows for the complete recovery of water produced by the facility, with industrial-grade sodium chloride and anhydrous sodium sulfate being separated through crystallization. As a result, zero wastewater discharge is achieved, and the salts are utilized in a resource-efficient manner.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.