Thread Content
Bid Invitation for Comprehensive Energy-Saving Research on the Circulating Water System of the Xilai Feng Methanol Plant of the Coking Company Author/Source: Date: 2022-05-24 Clicks: 6 1. Bidding Conditions The name of this bidding project is: Public Bid for Comprehensive Energy-Saving Research on the Circulating Water System of the Xilai Feng Methanol Plant of the Coking Company. The bidder is **Energy Group Coal Coking Co., Ltd., and the project owner is the Methanol Plant of Xilai Feng Branch, **Energy Group Coal Coking Co., Ltd.; the funding for this project comes from internal sources. *This project meets the bidding requirements, and public bidding for domestic qualification review is now being conducted for it. 2. Project Overview and Scope of Bidding 2.1 Project overview, scope of bidding, and division into bid sections (packages): It is divided into one bid section in total. 2.1.1 Project Overview: Comprehensive Energy Saving Study on the Circulating Water System of the Xilaifeng Methanol Plant of China National Energy Group Coking Co., Ltd. 2.1.2 Scope of bidding: The process flow of the methanol plant mainly includes purification, compression, conversion, synthesis, distillation, etc. The utility systems required to support these main processes include air separation, air compression, demineralized water, circulating cooling water, etc. In the aforementioned process flow, most of the process units use circulating cooling water for cooling. Various heat exchange units and process equipment influence one another, turning the temperature and quality of circulating cooling water as well as its heat exchange capacity into systemic issues. This affects the performance indicators of the production process, and the frequency and duration of maintenance required for the heat exchange equipment exceed the design specifications, thereby impacting the company’s profitability. Systemic problems require systemic solutions. Through the analysis of various influencing factors, interrelationships, and related processes in the circulating cooling water system of methanol plants, it is recommended to employ artificial intelligence-based group control technology and hydraulic balance technology to systematically address the quality issues associated with circulating cooling water, thereby improving cooling efficiency and production productivity. By establishing artificial intelligence-based centralized control systems and distributed supply and distribution systems, it is possible to transform cooling water, which currently can only be supplied in one quality, into cooling water that can be provided in various temperature levels and with different cooling capacities. This improves the quality of the circulating cooling water, thereby enhancing the stability of the production process and improving the management level of the circulating cooling water system, which in turn increases corporate profitability. 2.1.3 Service period: Completion within 120 working days from the date of contract signing. 2.1.4 Location of services: Methanol plant of Xilaifeng Branch, Energy Group Coking Co., Ltd. 2.2 Others: / 3. Bidder Qualification Requirements 3.1 Qualification and Experience Requirements: [1] Qualification Requirements: 1) The bidder must be an independently registered legal entity or other organization, and must provide valid proof documents. 2) Bidders must possess and provide a CMMI Integrated Software Capability Maturity Certification (Level 5 or above), along with valid supporting documents ; 【2】Financial requirements: / 【3】Performance requirements: From April 2017 to the bid deadline (subject to the contract signing date), the bidder must have at least 2 pieces of proof of successful implementation of energy-saving renovation projects related to the overall control optimization of circulating water systems. Bidders must provide contracts that demonstrate compliance with the performance requirements for this tender; the scanned copies of such contracts must include at least the pages bearing the signatures of both the buyer and seller, the date of contract signing, and information regarding the scope of services. 【4】Credit requirements: / 【5】Qualification requirements for the project leader: / 【6】Requirements for other key personnel: / 【7】Equipment requirements: / 【8】Other requirements: / Note: Qualifications and performance records of parent and subsidiary companies cannot be used interchangeably. 3.2 Joint bids are not accepted for this project. 4. The start time for purchasing the tender documents is 2022-05-24 09:00:00, and the deadline for purchasing them is 2022-05-31 16:30:00. *The price per set of tender documents for each bid section (package) is 500.0 RMB for Bid Section (Package) 1; no refund will be provided after purchase.