HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Bid Announcement for Centralized Procurement of Thermal Control Instruments for the Urea Hydrolysis Project in 2022 by Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd

2022-06-06View Original

Thread Content

Announcement on the Centralized Procurement of Thermal Control Instruments for the Urea Hydrolysis Project in 2022 by Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd. Author/Source: Date: 2022-06-06 Clicks: 7 Project location: Shaanxi Province 1. Bidding conditions: The centralized procurement of thermal control instruments for the urea hydrolysis project in 2022 by Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd. has been approved by the project approval authority; the funds for this project are provided by the company itself, and the bidder is Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd. This project is now ready for bidding, and public bidding is being conducted. 2. Project Overview and Scope of Bidding 2.1 Location of construction: Nationwide 2.2 Scale: Ranging from 300MW to 1000MW 2.3 Division into bid packages: Package 1 for the centralized procurement of thermal control instruments for the urea hydrolysis project in 2022, undertaken by Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd. 2.4 Delivery location: The project site designated by the tendering party 2.5 Delivery deadline: Within 30 days after receipt of the order notification. 2.6 Scope of bidding: In support of the urea hydrolysis project undertaken by Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd., a batch of thermal instruments and related accessories are to be purchased; specific details are provided in the technical specifications. This tender is for centralized procurement, with a validity period of 2 years from the date of contract signing; the quantity specified within this period is an estimated amount. The unit price for each model of instrument remains unchanged throughout the contract period, and settlement is made based on the actual order quantity. During the validity period, if the actual amount executed does not reach the estimated amount, the purchaser has the right to terminate or continue to execute this agreement. The purchaser does not guarantee that the final order quantity will reach the estimated amount; the tenderer assumes no responsibility, and bidders must fully consider the associated risks. 3. Qualification requirements for bidders 3.1 General qualification conditions (1) The bidder shall be an independently registered legal entity or other organization within the People’s Republic of China, with the capacity to assume civil liability independently and the right to enter into contracts on its own ; (2) The bidder shall meet the following conditions in terms of finance, reputation, etc.: (1) It is not under an order from the administrative authorities to suspend operations or go into bankruptcy proceedings ; (2) Not within the scope of bidding prohibition or the penalty period as confirmed by relevant documents from administrative authorities or entities within the China Huaneng Group Co., Ltd. system ; (3) No bid-rigging in the past three years, and no serious breaches of contract; no major or more severe quality incidents or major or more severe safety accidents caused by its products as determined by an appraisal agency ; (4) Not included by the market supervision and administration department in the list of enterprises with abnormal operations or in the list of enterprises with serious violations on the National Enterprise Credit Information Publicity System ; (5) Not included on the list of dishonest defendants by the Supreme People’s Court on the “Credit China” website (www.creditchina.gov.cn) or on credit information sharing platforms at various levels ; (6) Two or more legal persons whose legal representatives or persons in charge are the same, as well as parent companies, wholly-owned subsidiaries, and their holding companies, shall not submit bids simultaneously for the same bid section or for the same tender project without any division into bid sections. 3.2 Specific Qualification Requirements: (1) The bidder must have, as of January 1, 2017 (based on the date of contract signing), at least 2 delivery contracts related to thermal control instruments, with each contract having a value of not less than 1 million yuan; furthermore, the bidder’s total cumulative contract value must be at least 5 million yuan. Performance records must be accompanied by scanned copies of the contract (including the first page, pages showing the contract details, and the page with the signature), otherwise they will be considered invalid. (2) Joint bids are not permitted for this project. (3) This project accepts bids from agents. 4. Acquisition of tender documents: Available from 09:00 on June 2, 2022, until 17:00 on June 8, 2022. *Bid document fee: For the bid package \"Xi’an Xire Boiler Environmental Protection Engineering Co., Ltd.’s 2022 Annual Centralized Procurement of Thermal Control Instruments for the Urea Hydrolysis Project – Package 1\", the price is 1,500 yuan. 5. Submission of Bid Documents 5.1 Submission deadline: 09:00 on June 22, 2022 ; * 6. Time and Place of Bid Opening: Bid opening time: 09:00 on June 22, 2022
Reply #22022-06-06
Capacity: Ranges from 300MW to 1000MW. Delivery time: Within 30 days after the order is placed. One month, can it be delivered?
Reply #32022-06-06
This post was last edited by qugd on 2022-6-6 19:50. Check which table it is. Most conventional instruments should not pose any problems, but for those with special specifications, made from special materials, or are less commonly used analytical instruments, a month might be a bit tight. Additionally, it is possible that the date for placing the order will be some time after the award of the contract; this would actually give the manufacturer more time to prepare the goods, possibly more than 1 month, or even much longer.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.