HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Record an exception handling instance

2024-03-18View Original

Thread Content

I encountered a similar situation before: after a power fluctuation in the system, the staff didn’t have time to take action, and the air cooling system wasn’t activated in time. As a result, the temperature of the high-pressure side rose to 130°C, which led to full liquid levels in both the high-pressure and low-pressure sections. It was really scary at that moment. When this situation occurs, first activate the high-pressure air cooler promptly, then reduce the feed rate and increase the output of the light and heavy fractions. Lower the liquid level first. Please point out any shortcomings.
Reply #22024-03-18
It was handled in a timely manner. Next time, you can check the equipment status in advance to ensure a rapid response in case of any abnormalities. At the same time, strengthen training to ensure that employees can operate proficiently in emergency situations. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.