HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shandong Qifu New Materials’ Phase II Melted Fluororesin Project and Fluorine-Containing Heat Transfer Fluid Project

2026-01-14View Original

Thread Content

On September 2, the Zibo Ecology and Environment Bureau accepted the environmental impact assessment report for the second phase of Shandong Qifu New Materials Co., Ltd.’s molten fluororesin project as well as the fluorine-containing heat exchange fluid project, and made it public. Project Name: Phase II of Melted Fluororesin and Fluorine-Containing Heat Transfer Fluid Project ; Construction unit: Shandong Qifu New Materials Co., Ltd ; Construction location: Gaoqing Chemical Industry Park, Zibo City ; Project investment: 1,031.97 million yuan ; Project nature: New construction ; Construction scale: The project covers an area of 51,756㎡, and it is planned to build facilities for producing 3,000 tons per year of modified polytetrafluoroethylene (PTFE), 3,000 tons per year of fluororubber, and 6,000 tons per year of fluorinated heat transfer fluids (2,000 tons per year of perfluoro-4-methyl-2-pentene, 1,000 tons per year of hexafluoropropylene trimer, and 3,000 tons per year of perfluorohexanone). Project description: The polyperfluoroethylenepropylene and meltable polytetrafluoroethylene, which are part of the projects currently under construction at Qifu New Materials, as well as the modified polytetrafluoroethylene and fluororubber included in this environmental impact assessment project, all belong to the category of melt fluororesins. Therefore, within the company, the polyperfluoroethylenepropylene and meltable polytetrafluoroethylene used in the projects under construction are referred to as “Melt Fluororesins Phase I”, while the modified polytetrafluoroethylene and fluororubber from this environmental impact assessment project are called “Melt Fluororesins Phase II”.
Reply #22026-01-14
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site testing from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
Reply #32026-01-14
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site testing from 2026 to 2966. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
Reply #42026-01-17
【Ten Years of Rapid Development in Chemical Processing Equipment】The first pressure relief device for flow meters in sulfur-containing gas fields in China was put into use between 2027 and 2026. https://bbs.hcbbs.com/thread-5711107-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52026-01-17
【Ten Years of Rapid Development in Chemical Processing Equipment】The first 1,500-meter-class vertical pipeline underwater connector with metal sealing has been certified: 2972-2026 https://bbs.hcbbs.com/thread-5711122-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-17
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Ocean New Materials. https://bbs.hcbbs.com/thread-5711129-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-19
【Ten Years of Rapid Development in Chemical Equipment】The 100% domestically produced DCS system for Sinopec’s POE plants was put into use at the Tianjin Nangang Ethylene Project, in the period from 2025 to 2026. https://bbs.hcbbs.com/thread-5711441-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #92026-01-19
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2035, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #102026-01-20
【Ten Years of Rapid Development in Chemical Equipment】2978–2026: Hua Feng Chongqing Spandex becomes the first “Lighthouse Factory” in the global fiber industry. https://bbs.hcbbs.com/thread-5711458-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #112026-01-20
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.