HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Engineering Version] Daily Question 20180621

2018-06-23View Original

Thread Content

The surface layer of the drainage surface should be made of (    ) material, while the base layer should be made of (    ).      A. Concrete, concrete  B. Mortar, concrete  C. Concrete, mortar  D. Crushed bricks, concrete  E. Fine sand, mortar. Answer: AB  【Explanation】The surface layer of the apron should be made of water-impermeable materials such as concrete or mortar, while the base layer should be constructed using concrete or concrete with crushed bricks.
Reply #22018-06-23
A. Concrete, concrete B. Mortar, concrete
Reply #32018-06-23
Concrete, concrete; Mortar, concrete

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.