How to conduct pressure testing on a tower

2017-06-13View Original

Thread Content

Please share how many methods there are for pressure testing tower equipment. The length of such tower equipment is usually around ten to twenty meters
Reply #22017-06-13
If it is fully manufactured at the factory, then it shall pass the hydrostatic test while lying down at the factory. In the case of segmented transportation and on-site welding, depending on the specific circumstances, it is possible to request that the components be joined in a horizontal position on site, undergo pressure testing in that position, and then be lifted as a whole ; Install in sections on-site, and conduct vertical pressure testing.
Reply #32017-06-13
Apply direct pressure; adjust the test pressure according to the design pressure and the static pressure of the vertical liquid column
Reply #42017-06-13
See when the pressure test will take place. Everything about the pressure testing of the new tower has been discussed earlier. After maintenance, pressure testing can be carried out using nitrogen, steam, or other substances depending on the existing medium, to check for leaks.
Reply #52017-06-13
In this way, a large amount of water isn’t used, right? Are there any simple methods for pressure testing?
Reply #62017-06-13
A low design pressure allows the use of air pressure; for hydrostatic testing, the static pressure of the liquid is taken into account
Reply #72017-06-14
The towers we install on-site are generally subjected to pressure testing after being filled with liquid; the advantages of this are, first, to identify any leakage points in the tower, and second, to test for ground settlement. After the irrigation test, conduct a steam pressure test.
Reply #82017-06-14
What can be done? That’s just the standard specification. I suggest choosing a larger pump; I once used one on a tower for a week
Reply #92017-06-14
What can be done? That’s just the standard specification. I suggest choosing a larger pump; I once used one on a tower for a week
Reply #102017-06-14
Your question is really scary; I don’t know how to carry out pressure testing. Please don’t touch anything – let professionals do it according to the design specifications

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.