The stripping tower, the largest and heaviest equipment in the Zhejiang petrochemical project, has been successfully hoisted into place

2018-11-03View Original

Thread Content

On the morning of November 3, 2018, the largest piece of equipment for Zhejiang Petrochemical’s 40 million tons per year integrated refining and chemical processing project – the extractive tower with a capacity of 2.6 million tons per year – was lifted into place in sections. @Fish in the desert
Reply #22018-11-03
This post was last edited by The wise on 2018-11-3 at 20:44. The stripping column of the aromatic hydrocarbons complex plant was manufactured by Ningbo Tianyi, with a total weight of 1,900 tons (column height? Length: ?? meters (the diameter has not yet been determined); it will be lifted in two sections, using an XCMG 4000-ton crawler crane for the main lifting operation and a Sany 1600-ton crawler crane for assisting with the lifting.
Reply #32018-11-03
Without comparison, there is no hatred. The heaviest equipment lifted before this was the 2# propylene tower of the ethylene plant, which weighed 1,800 tons. The largest equipment of the Zhejiang Petrochemical project – Tower No. 2 for propylene – has been successfully lifted https://bbs.hcbbs.com/thread-1885146-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42018-11-03
Due to the excessive weight of the residue liquid tower, the lifting was not carried out in a holistic manner; moreover, it is evident that the modular installation method involving the use of specialized components was not fully applied – only the pipelines attached to the tower and the railing for the ladder platform were installed, which increases the difficulty of subsequent insulation work.
Reply #52018-11-04
The insulation work seems to not have enough time left; the scaffolding for this tower should be erected all the way to the top by then.
Reply #62018-11-04
I haven’t seen any news; probably they need to keep a low profile these days
Reply #72018-11-04
He, just like me, sees the news and shares it with everyone. How about adding him to the WeChat Moments?
Reply #82018-11-04
The scaffolding can be erected in sections. Has the delivery been completed, so that the crane schedule can’t be met?
Reply #92018-11-04
I heard it’s too heavy and can’t be lifted.
Reply #102018-11-04
It seems the deadline is too tight, so the installation of certain components has been halted. A lifting injury accident at the Zhejiang Petrochemical project https://bbs.hcbbs.com/thread-2128185-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.