HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the method for indicating openings in the steel platform floor of 33m tower equipment?

2018-12-20View Original

Thread Content

Is this the way to represent an opening in the floor – with a circle followed by an arc on the left? If a small steel platform is placed on the floor and the equipment is fixed to that platform using brackets, does that circular equipment also need to be represented by a circle followed by an arc?
Reply #22018-12-20
This question is suitable for the tower equipment section; this area is related to processes.
Reply #32018-12-20
It’s the one in the equipment layout diagram
Reply #42018-12-20
You can’t explain it clearly; can’t you just paste a picture instead?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.