Causes of wall perforation in flue gas desulfurization quench towers

2018-09-17View Original

Thread Content

For the flue gas desulfurization quench tower, Q235+316L composite steel is used in the section where the flue gas enters the tower, while Q235+resin glass flake material is used in other areas. During operation, a hole appeared about 10 centimeters below the welds in the lower part of the quench tower, at the entrance area for flue gas. Based on the shape of the leakage, it was determined that it was caused by erosion. Due to the presence of resin glass flakes inside, there was concern that high welding temperatures might damage these flakes; therefore, welding was not attempted to seal the leak. I would like to know what approach should be taken to address this issue.
Reply #22018-09-17
It is suspected that there were quality issues with the glass flake lining during installation, causing it to fall off under the impact of the flue gas. The flue gas, along with dust containing water, then struck the vessel walls directly, resulting in perforations and leaks.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.