The 2# propylene tower of Sinochem Quanzhou Ethylene and Refining Renovation and Expansion Project was successfully hoisted

2019-01-29View Original

Thread Content

  On January 23, the No. 2 propylene tower of Sinochem Quanzhou’s 1 million tons/year ethylene and refinery expansion and expansion project was successfully hoisted, and the project equipment installation was fully accelerated. The entire hoisting process lasted 12 hours and 43 minutes, and the entire process was safe and smooth. The 2# propylene tower is the second overweight equipment successfully hoisted in Sinochem Quanzhou Ethylene Project. It is also the tallest, heaviest and largest equipment in the project, and is extremely difficult to hoist. The picture shows the hoisting site. (Photo by Zhong Hua) Time: 2019/01/29Source: Sinochem News Network
Reply #22019-02-01
Can you describe the general parameters of the equipment and the selection of the crane? In addition, I really don’t know why the hoisting lasted for such a long time. Could it be the aerial assembly?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.