Thread Content
Dear experts, I would like to ask what key points need to be considered regarding the demolition and installation of tower-type equipment during the relocation of chemical processing equipment Thank you!
Personally, I think it is important to pay attention to safety issues during the demolition process, to consider the location of the lifting equipment, to prevent deformation of the tower, and to leave enough space for working when removing the ladder platforms and connecting pipelines; During the transportation process, it is necessary to consider the means of transport and the route in advance; if needed, contact the traffic authorities to implement traffic controls. It is also important to protect the equipment throughout the transportation process to prevent it from becoming deformed or damaged ; Before installation, it is necessary to prepare a construction plan, a lifting plan, and so on. This is not an exhaustive list; there are many other details that need to be taken into account.
Additional notes: Before disassembly, it is necessary to clean and replace the components thoroughly; if needed, blind flanges should be used for isolation (or all connecting pipelines should be removed first); Thorough inspection is also required inside the equipment (especially pressure vessels). With these preparatory tasks done, the rest can be left to professional construction teams.